RV Aircraft Construction Website


RV-Related Videos and More!
[Previous]   [1]  Page 2 

Van's Aircraft - RV-12iS Stabilator Part 4 - Smitty's RV
In this video, I'm putting the Hinge Brackets together for the front spar of the Stabilator.
Van's Aircraft - RV-12iS Stabilator Part 3 - Smitty's RV
In this video I'm attaching the Upper and Lower Cable Attach Horns.
Van's Aircraft - RV-12iS Stabilator - Part 2 - Smitty's RV
In this video, I'm continuing work on the Stabilator, creating the spar box assembly.
Van's Aircraft - RV-12iS Stabilator - Part 1 - Smitty's RV
In this video, I'm starting work on the Stabilator.
Van's Aircraft - RV-12iS Anti-Servo Tab - Smitty's RV
In this video, I'm building the Anti-Servo Tab for the RV-12iS Stabilator.
Van's Aircraft - RV-12iS Rudder Part 3 - Smitty's RV
In this video, I'm completing my work on the RV-12iS Rudder.
Van's Aircraft - RV-12iS Rudder Part 2 - Smitty's RV
In this video, I'm working some more on the RV-12iS Rudder.
Van's Aircraft - RV-12iS Rudder Part 1 - Smitty's RV
In this video, I'm starting work on the RV-12iS Rudder.
Van's Aircraft - RV-12iS Vertical Stabilizer - Part 2 - Smitty's RV
In this video, I'm completing work on the RV-12iS Vertical Stabilizer.
Van's Aircraft - RV-12iS Vertical Stabilizer - Part 1 - Smitty's RV
In this video, I'm starting work on the RV-12iS Vertical Stabilizer.
Van's Aircraft - RV-12iS Empennage/Tailcone Kit Inventory - Smitty's RV
In this video, I'm doing the inventory to make sure that all the parts are there. It's a long task, but well worth it!
RV-12iS Empennage/Tailcone Kit Unboxing - Smitty's RV
It's here! The truck has arrived and we're unboxing the Empennage/Tailcone Kit.

SmittysRV.com is an Amazon Associate
Aircraft fiberglass 101
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
gopro camera mounts for aircraft
Rod Machado Pilot Training
Rod Machado Pilot Training
RV-9A Construction Log:

Find entries in my Construction Log:
Search For:
Do what your Mama said...Go Play!
Share this on: This New Old RV - The Renovation and Redo
RV-9A Log Entries:

Preparation

Empennage
- Horizontal Stabilizer (49:40)
- Vertical Stabilizer (21:15)
- Rudder (32:15)
- Right Elevator (35:45)
- Left Elevator (30:50)

Wings
- Inventory & Setup (9:30)
- Left Wing Prep (54:30)
- Left Fuel Tank (45:20)
- Left Wing Skins (46:10)
- Right Wing Prep (34:15)
- Right Fuel Tank (47:50)
- Right Wing Skins (40:15)
- Ailerons (54:30)
- Flaps (40:30)
- Rods and ends (18:45)

Fuselage
- Fuselage Parts List
- Inventory and Setup (7:15)
- FireWall (14:30)
- F-704 Bulkhead (13:25)
- F-705 Bulkhead (14:20)
- Other Bulkheads and Longerons (17:30)
- Tailcone (29:30)
- Center Section (35:15)
- Forward Section (52:40)
- Forward Assembly (24:30)
- Skins/Baggage Area (46:30)
- Seats & Seat Floors (30:15)
- Flaps & Gear Mounts (18:15)
- Fuselage Plumbing (14:0)
- Tail Feathers (16:35)
- Front Deck/Firewall (58:50)

Finish Kit
- Electrical (57:30)
- Electrical Part 2 (24:0)
- Canopy (22:30)
- Landing Gear (18:35)
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE