RV-9A Construction Log
Use the Search form below to look through my Construction log for building entries.
Use the Search form below to look through my Construction log for building entries.
Preparation
Empennage
- Horizontal Stabilizer (49:40)
- Vertical Stabilizer (21:15)
- Rudder (32:15)
- Right Elevator (35:45)
- Left Elevator (30:50)
Wings
- Inventory & Setup (9:30)
- Left Wing Prep (54:30)
- Left Fuel Tank (45:20)
- Left Wing Skins (46:10)
- Right Wing Prep (34:15)
- Right Fuel Tank (47:50)
- Right Wing Skins (40:15)
- Ailerons (54:30)
- Flaps (40:30)
- Rods and ends (18:45)
Empennage
Wings
Fuselage
- Fuselage Parts List
- Inventory and Setup (7:15)
- FireWall (14:30)
- F-704 Bulkhead (13:25)
- F-705 Bulkhead (14:20)
- Other Bulkheads and Longerons (17:30)
- Tailcone (29:30)
- Center Section (35:15)
- Forward Section (52:40)
- Forward Assembly (24:30)
- Skins/Baggage Area (46:30)
- Seats & Seat Floors (30:15)
- Flaps & Gear Mounts (18:15)
- Fuselage Plumbing (14:0)
- Tail Feathers (16:35)
- Front Deck/Firewall (58:50)
Finish Kit
- Electrical (57:30)
- Electrical Part 2 (24:0)
- Canopy (22:30)
- Landing Gear (18:35)
Finish Kit