RV Aircraft Construction Website

RV-12iS Construction Log:

1st Things First
- Getting Ready
- Pop-riveting
- Compressors
RV-12iS Tools & Techniques
- Drilling
- Dimpling and Countersinking
- Tools
- Riveting
Checked the depth of the countersink
I did a test fit with a loose rivet to make sure that the head was flat across the surface.




Rod Machado Pilot Training