RV Aircraft Construction Website

RV-12iS Construction Log:

1st Things First
- Getting Ready
- Pop-riveting
- Compressors
RV-12iS Tools & Techniques
- Drilling
- Dimpling and Countersinking
- Tools
- Riveting
Smoothed the edges on the vertical stabilizer skins
Sometimes on the scotch-brite wheel, but mostly with 320 grit sandpaper.




Rod Machado Pilot Training