Smitty's RV-9A - Experimental Aircraft from Van's Aircraft The RV-9A from Van's Aircraft  
Howdy Ya'll
Howdy! I building an RV-9A! I'm an aviation nut and am excited about building my RV-9A from Van's Aircraft. Have a look around!
Smitty on FaceBook
Smitty on Twitter
Smitty on YouTube
Do what yer' Momma said...
Go Play!
Navigation
Homepage
Log Search
RV How-to Videos
RV TOOLS & BOOKS!
Places to FLY your RV!
Aviation Videos!
RV Resources
Become a PILOT!
RV-7/9 Drawings
ID: Pswd: RV-6A RV6A RV6 RV-6A RV7A RV7 RV-9A RV-9 RV9 RV-8A RV-8 RV8 RV-10 RV10 aviation aircraft Van's Aircraft RV8 RV8A RV-8 RV-8A RV-6 RV6 RV-6A RV6A RV-9 RV-9A RV9 RV9A RV10 RV-10 aopa eaa aviation experimental homebuilt airplane aircraft plane oshkosh
RV Construction Log
Preparation
Empennage
- Horizontal Stabilizer (49:40)
- Vertical Stabilizer (21:15)
- Rudder (32:15)
- Right Elevator (35:45)
- Left Elevator (30:50)
Wings
- Inventory & Setup (9:30)
- Left Wing Prep (54:30)
- Left Fuel Tank (45:20)
- Left Wing Skins (46:10)
- Right Wing Prep (34:15)
- Right Fuel Tank (47:50)
- Right Wing Skins (40:15)
- Ailerons (54:30)
- Flaps (40:30)
- Rods and ends (18:45)
Fuselage
- Fuselage Parts List
- Inventory and Setup (7:15)
- FireWall (14:30)
- F-704 Bulkhead (13:25)
- F-705 Bulkhead (14:20)
- Other Bulkheads
   and Longerons
(17:30)

- Tailcone (29:30)
- Center Section (35:15)
- Forward Section (52:40)
- Forward Assembly (24:30)
- Skins/Baggage Area (46:30)
- Seats & Seat Floors (30:15)
- Flaps & Gear Mounts (18:15)
- Fuselage Plumbing (14:0)
- Tail Feathers (16:35)
- Front Deck/Firewall (58:50)
Finish Kit
- Electrical (57:30)
- Electrical Part 2 (24:0)
- Canopy (22:30)
- Landing Gear (18:35)
How I Did Stuff
Pop-Rivet Dimpler 101
My Wing Jig
My Wing Cradle
Wing Cradle Mod
Tilting Tank Jig
Delrin Aileron Stops
Nutplate Preparation
Fiberglass 101
Events and News
Aviation Events
Aviation Events Around Texas
Fun Places To Fly in Texas
Aviation News
RV Groups & Support
Rivet Bangers
Van's Air Force
RV Information
How to Land an RV
Van's Aircraft
RV Resources
RV Photo Album
Completed RV-9's
RV-7/9A Drawings
Nut & Bolt Torque Values
Misc Goodies
Fuselage Parts List
How to Land an RV
My Tools
Fix a Heavy Wing
Paint Possibilities
Electrical - Part 2 - 9/25/2011
Home  Previous Entry  Next Entry  Back
 
Share on:
Back to work!Back to work!
Well, it's been 3 months since my last confession (err- entry). We have been remodeling our kitchen, a total rip-out and re-do. Now it's back to work. Here I've finished the putting the mounting frame rear components together. The wiring harness came from Steins. The installation instructions for the Garmin SL40 are pretty easy to follow, but you won't find them on the Garmin website, weird. I also got the RG-400 coaxial cable from Steins. The instructions for connecting the coaxial to the back of the mounting frame were pretty simple to follow.
Bundled up and ready to goBundled up and ready to go
I'm going to try and put as much of panel together on the temporary stand as possible, and then move everything over to the RV.
Making stuff easier to reachMaking stuff easier to reach
I'm going to finish the back of the transponder mounting frame next, but it's under the radio mounting frame and hard to get to. Since there's so much weight behind the panel, I think it's OK to lean the panel forward to allow me access to the transponder frame back. So I split a 2x4 diagonally and made some wedges that I screwed to the bottom of the wooden panel frame.
Panel mountingPanel mounting
I used some sheetrock screws to hold the panel to the panel stand. I'm hoping the cloth I put on the stand will protect the back of the painted panel somewhat. The way the heads of the sheetwork screws are made, they don't mess up the paint in the front of the panel.
Yep, that'll workYep, that'll work
You'll notice a metal strap mounted from the base of the wooden stand to the top of the panel. That's just there to help support the weight of the components already mounted on the panel.
Here's the new kitchenHere's the new kitchen
Nope, not completely finished. The backsplash is on it's way. This is first time I've let someone else put in a new kitchen for me. Never again. DIY - Do It Yourself! Three months to install a kitchen is totally ridiculous. The company that designed the cabinets as was in charge of ordering the components could never get it right. There was a constant ordering and reordering of incorrect parts, broken parts and missing parts. The installer they hired was crackerjack and was totally frustrated to come in and only be able to do partial work because of incorrect or missing components. If I ever decide to install cabinets again, I'm either going to do it myself or hire a real cabinet maker (person) to do it, not a retail store outlet.

The granite countertop turned out great! Those guys new what they were doing! Mainly because they were independent contractors.

The rest of the kitchenThe rest of the kitchen
How much you ask? Just take the cost of a brand new Lycoming O-320 engine and multiply it by 1.5. Ouch!
Home  Previous Entry  Next Entry  Back
HELP FOR THE HOMEBUILDER

A website designed for Van's Aircraft Homebuilders, helping them find the information they need to build the most dynamic aircraft in the world.
The "cover your butt" section
This website was built to document the construction of an RV-9A in compliance with the FAA requirements needed to certify the aircraft. Any experiences and/or comments are by no means to be considered as instructions on how to build an RV-9A or any other aircraft.
This is website is owned and published by OpenAirNet, Inc. © 2015. All rights reserved.
Cool Stuff
How Far is that Airport?