RV Aircraft Construction Website

RV-9A: Center Section - 12/17/2008
Home  Previous Entry  Next Entry  Back
 
Share on:
Rebolted the F-904 bulkhead to the rear half.Rebolted the F-904 bulkhead to the rear half.
It's time to final drill the bottom skin and the F-904H side doublers.

Hey, check out my new Blog thingy!

Final drilled the F-904H side doublersFinal drilled the F-904H side doublers
It took quite a while to drill these side doublers into the F-904 bulkheads, since there weren't any pre-drilled holes in the F-904 bulkheads. I used the F-904H side doublers as a template for drilling.
Time to final drill the bottom skin to the bulkheadsTime to final drill the bottom skin to the bulkheads
This is somewhat of a head scratcher. I decided to final drill and countersink the holes in the skin, as suggested by option #2 in Van's article.
Making notes on the bulkheadMaking notes on the bulkhead
These holes will need to countersunk so the rivets will be installed "double flush".
Time for sanding and dimplingTime for sanding and dimpling
I took the center section apart, being careful to mark each part as to where it will go back.
Time for soldering iron therapyTime for soldering iron therapy
Put on the music and relax! This whole plastic removing ritual is probably totally unnecessary, but I still enjoy doing it.
Home  Previous Entry  Next Entry  Back

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training