RV-9A: F-704 Bulkhead - 4/9/2008
Home Previous Entry Next Entry Back |
Share on:
|
|
Countersunk the F-904G Vertical Bars I countersunk these bars and made sure that a test rivet set flat in the hole.
|
Started riveting on the F-904C and F-904D side sections I was able to use my pneumatic rivet squeezer for most of these rivets. The 6 inner most rivets were put in with a rivet gun and bucking bar.
|
Here's the flip side I thought these rivets were a little too long for this application, but that's what's on the plans.
|
Riveted on the Vertical Bars The plans called for AN426D4-14 rivets, which are some really long-ass rivets. But they were still to short to really do a good job of riveting. There weren't any other longer rivets, so I just did as good as I could. I can see where these rivets don't really do anything structural, since these bars are really held in place later with the bolts anyway. So the "too-short" rivets are just to hold the bars in place until final assembly.
|
Done! (with this part anyway)
|