RV-9A: F-704 Bulkhead - 4/9/2008
Home  Previous Entry  Next Entry  Back
 
Share on:
Countersunk the F-904G Vertical BarsCountersunk the F-904G Vertical Bars
I countersunk these bars and made sure that a test rivet set flat in the hole.
Started riveting on the F-904C and F-904D side sections Started riveting on the F-904C and F-904D side sections
I was able to use my pneumatic rivet squeezer for most of these rivets. The 6 inner most rivets were put in with a rivet gun and bucking bar.
Here's the flip sideHere's the flip side
I thought these rivets were a little too long for this application, but that's what's on the plans.
Riveted on the Vertical BarsRiveted on the Vertical Bars
The plans called for AN426D4-14 rivets, which are some really long-ass rivets. But they were still to short to really do a good job of riveting. There weren't any other longer rivets, so I just did as good as I could. I can see where these rivets don't really do anything structural, since these bars are really held in place later with the bolts anyway. So the "too-short" rivets are just to hold the bars in place until final assembly.
Done! (with this part anyway)Done! (with this part anyway)
Home  Previous Entry  Next Entry  Back

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training