RV Aircraft Construction Website

RV-9A: F-704 Bulkhead - 3/31/2008
Home  Previous Entry  Next Entry  Back
 
Share on:
Finished drilling all of the 5/8 inch holesFinished drilling all of the 5/8 inch holes
I had to drill 12 5/8 inch holes in all.
Ready to drill the F-904G Vertical BarsReady to drill the F-904G Vertical Bars
What bar? Oh, it's there, under the clap, aligned by 2 bolts in the pre-drilled holes. I drilled two 1/8 inch holes throught the pre-drilled holes in the F-904D.
Here's the finished productHere's the finished product
There are some really long rivets that will go in these holes.
Final drilled all the 1/8 inch holes in all 4 side platesFinal drilled all the 1/8 inch holes in all 4 side plates
My kind of squirrel!My kind of squirrel!
I took this shot while we were sitting down to lunch! Only brave squirrels (or crazy ones) hang out in my back yard.
Home  Previous Entry  Next Entry  Back

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training