RV Aircraft Construction Website

RV-9A: Rudder - 11/1/2005
Home  Previous Entry  Next Entry  Back
 
Share on:
Started work on the Rudder SkeletonStarted work on the Rudder Skeleton
Clecoed the bottom rib to the front spar and final drilled the holes. Also created a small 3 1/2 x 1 1/8 inch shim from a long piece in the kit that was already 1 1/8" inches wide.
Clecoed on the reinforcement plates, tip and counterbalance ribsClecoed on the reinforcement plates, tip and counterbalance ribs
Then I final drilled everything with a #30 drill bit.
Clecoed on the counterbalance skinClecoed on the counterbalance skin
I removed the top ribs from the spar and clecoed on the counterbalance skin on to the ribs. Then I put the whole assembly back on the spar and final drilled the skin with a #40 drill bit. This was the tightest sock I ever put on! I started clecoing on the end of one side and worked my way around to the other with the clecoes.
Clecoed on the outer skinClecoed on the outer skin
Wow! This dude is huge! After I inserted the rudder trailing edge and got everything clecoed together, I was amazed at how stout this thing is.
Home  Previous Entry  Next Entry  Back

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training