RV Aircraft Construction Website

RV-9A: Project Entry
Share on:
Share this! Twit this! 

Drilled the holes in the Gascolator bracket

I removed the rudder pedal assembly so I could get a good shot at drilling these holes. The gascolator on the forward side of fuselage will be bolted on later. I used my unibit to start the hold in the bracket. Then when I reached the 5/8" mark on the bit, I moved to the forward side of firewall. When I went over to the forward side, I found that the %^&* stainless steel metal in the firewall had a ragged cut and almost looked like a flower of metal blooming around the 5/8" hole. I used a small pair of needlenose pliars to push the flower edges of the hole back inside the hole. Then when I used the unibit on the forward side of the firewall, it removed the excess metal and made a nice clean hole in the firewall.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training