|
Share on:
|
|
|
Started riveting the Nose Rib/Hinge Assemblies to right FL-903 Spar.
Having done this already on the left flap, I knew just how approach this riveting session. This right flap should go a lot faster. I'm beginning to think that the technique of doing the left side first on any left/right assemblies, is the way to go. This way the right assemblies done after the left usually take less time and turn out better looking when completed.
|
|