RV Aircraft Construction Website

RV-9A: Project Entry
Share on:
Share this! Twit this! 

Started drilling the trailing edges on the flaps

I got a fresh drill bit out and started drilling the trailing edge of the flaps. I held the skin down with one hand and drilled with the other, all the way through the top skin, wedge, bottom skin, aluminum angle and into the particle board work bench top. Then I clecoed every hole to the particle board top. This dude is really going to be straight.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training