RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 

Riveted on the VA-112 drain flange

I pushed the rivets into the holes one at a time and squeezed them in place with my 4 inch yoke and hand squeezer. The proseal oozed out everywhere, especially in the screw hole in the middle of the drain flange. I cleaned everything up with a paper towel and lacquer thinner. To clean out the screw hole, I rolled up a piece of paper towel and forced it through the hole and pulled it through the other side, turning it as I pulled it through.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training