|
Share on:
|
|
|
Laid everything out
After transferring the bolt positions off the ruler onto the tank baffle, I laid out the "Z" brackets over their associated ribs on the back of the baffle. Then I located the W-932DG drill guides that will be used to insure the proper initial drilling of the "Z" brackets.
|
|