RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 

More riveting prep…

I removed the rear spar and replaced it with a piece of scrap aluminum angle. It’s just long enough to provide some stability to the whole assembly. I put a 6 foot piece of black rubber matting under the assembly to help prevent any scooting around during the riveting session. You can get these 6 foot rubber mats from Harbour Freight. They’re a lot cheaper there than anywhere else. Tomorrow, I will remove the all of the end ribs, leaving the ones attached to the temporary aluminum angle. Then I will rivet each rib in place, one at a time, working my way from the middle to the end of the spare on each end.UPDATE 12/13/2006: After riveting this dude together I found that the aluminum angle was totally unnecessary. Also, the order in which I did the ribs is totally different than what I logged here. Look at the next page.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training