RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 

Started work on the W-933 Tie-down Bar

I already prepared the Tie-down bar when I was working on the left wing, so all I have to do is drill the holes and bolt it in place. I lined up the bar with the pre-drilled holes on the spar and drill out one pilot hole and clecoed the bar in place.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training