RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 

Starting messing around with the tank vent line.

I was amazed at how soft this tubing was. It was very easy to work with. I un-rolled and straightened a 5-6 foot section of tubing and then put in the black plastic hole collars into the ribs. Then I started pushing the tubing into place, through the large access plate hole in the inboard rib. I didn’t have to use the bending springs at all. The tubing straightened out nicely just using my hands.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training