|
Share on:
|
|
|
Leveled the rig on the jig (sorry, I had to say it again)
I got a 2x2 board and marked the existing distance (with the sag) between the floor and the rear spar. Then measured the distance that the rig was sagging using the string as a go by. I added that distance to the mark I had just made on the 2x2 and cut the board. I stuck the leg under the rear and it came out perfect. Now for them sheets!
|
|