RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 

Drilled the holes for the nut plates

I temporarily put a bolt into the nutplate hole from behind to hold the nutplate in place so I could drill the #40 holes for the flush rivets that hold the nutplate in place. After I drilled all the holes for the rivets, I flipped the tie-down bar over in the vise and countersinked the rivet holes with my Micro Stop Countersink. Then I riveted on the nutplates.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training