RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 

Prosealing the left elevator trailing wedge in

Knowing that I had to proseal the trim tab, I decided to wait until I got to that point and do the elevator trailing edge at the same time. Just as before, I placed a wooden dowel rod in the mouth of the trailing edge opening so I could get the wedge with the proseal into position. Then I slipped the dowel rod out, allowing the trailing edge to close in around the aluminum wedge. Then I clecoed everything down to the aluminum angle and the wooden block below.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training