|
Share on:
|
|
|
Prosealing the left elevator trailing wedge in
Knowing that I had to proseal the trim tab, I decided to wait until I got to that point and do the elevator trailing edge at the same time. Just as before, I placed a wooden dowel rod in the mouth of the trailing edge opening so I could get the wedge with the proseal into position. Then I slipped the dowel rod out, allowing the trailing edge to close in around the aluminum wedge. Then I clecoed everything down to the aluminum angle and the wooden block below.
|
|