RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 

Getting the table ready for the riveting session

I put my steel angle on the edge of the work bench and held it in place with a couple of nails driven into the side of the work bench and bent them over the steel angle. I layed small sheet of 1/4 inch plywood on top of the work bench to make the elevator lay flat on the plywood and the steel angle while riveting. I also put a sheet of the tool box rubber stuff on top of the plywood to keep the elevator from moving while riveting the edge.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training