RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 

Sand, sand, sand, sand, sand, sand, sand......

I read in the instruction manual where it said the sanding is the toughest and most time consuming part of the construction process. They weren't kidding. The outside edges weren't so bad because I could make a couple of passes over the Scotchbrite wheel and then smooth it out with some 400 grit sandpaper. But the holes were a different story, sanding these dudes took a really long time. I rounded off the edges with a tougher grit of sandpaper and then finished it off with the sponge sandpaper with a finer grit.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training