RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 
GO BACK

Time to drill the nutplate holes into the F-706 bulkhead

First, to make sure that I have the panel lined up, I put several screws (hand tight only!) into the bottom of the baggage panel into the fuselage bulkhead and clecoed the rest. These are the screws that will be used later when it's time to tighten things up all the way.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
vans rv tumblers
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
vans rv tumblers
vans rv tumblers
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training