RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 
GO BACK

Done!

Now both top and bottom bulkhead are clecoed together. Next I will drill the nutplate holes on each side of the seat belt cable slots, but only the top bulkhead. Then I'll use those holes as a jig to drill the bottom bulkhead holes.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
vans rv tumblers
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
vans rv tumblers
vans rv tumblers
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training