RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 

FInal drilled the rest of the holes in the F-747 baggage floors

Some of the holes were final drilled in a previous step. Now I needed to final drill the other holes around the edges. All this work was done with the top skins still off at this time. It would be pretty tough to get to the rear nutplates if the top skins were still on.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training