RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 
GO BACK

Time to start fittin' and drillin'

I started at the longeron and worked my way up, drilling and clecoing, using the line drawn on the flange as my guide, until after drilling the 3rd hole, and the line disapeared. I took the rib off and put a single flute above the 3rd hole in the rib flange. Then I was able to drill and cleco for several more holes.
.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
vans rv tumblers
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
vans rv tumblers
vans rv tumblers
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training