|
Share on:
|
|
|
Time to finish up the F-728 vertical channel
After final drilling F-728A vertical channel to the F-706 bulkhead, I clecoed the F-728B angle back onto the F728A channel and started riveting it to the channel. This old spar jig came in handy, holding everything for me while I riveted.
|
|