RV Aircraft Construction Website

RV-9A: Project Entry

Share on:
Share this! Twit this! 

Started work on the F-902-L&R Forward Bulkheads

The flanges on these bulkheads have to be fluted in order to make the pre-drilled holes line up with the pre-drilled holes in the outside skin. I also enlarge the pre-drilled hole for the rudder cable with my Unibit.

SmittysRV.com is an Amazon Associate
SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training