|
Share on:
|
|
|
Started work on the F-902-L&R Forward Bulkheads
The flanges on these bulkheads have to be fluted in order to make the pre-drilled holes line up with the pre-drilled holes in the outside skin. I also enlarge the pre-drilled hole for the rudder cable with my Unibit.
|
|