Starting riveting in the center section floor ribs Here I'm countersinking the spar to allow the rivet to sit flush on the edge of the spar. I squirted some primer on it and then used my hand squeezer to set the rivets.
|
Time to squeeze the big rivets I like to use my pneumatic squeezer when ever I can. I had to remove the bottom die to get the squeezer into position. Check out my Pneumatic Squeezer Tool Tips Blog for stuff I've learned about using the squeezer.
|
Time to finish the rest of the rivets I was only able to get to the top and bottom rivets on each floor rib with the pneumatic squeezer, so I switched to the old reliable rivet gun and bucking bar.
|
Done! Now to find those bolts and nuts for the rest.
|