Smitty's RV-9A - Experimental Aircraft from Van's Aircraft The RV-9A from Van's Aircraft  
Howdy Ya'll
Howdy! I building an RV-9A! I'm an aviation nut and am excited about building my RV-9A from Van's Aircraft. Have a look around!
Smitty on FaceBook
Smitty on Twitter
Smitty on YouTube
Do what yer' Momma said...
Go Play!
Navigation
Homepage
Log Search
RV How-to Videos
RV TOOLS & BOOKS!
Places to FLY your RV!
Aviation Videos!
RV Resources
Become a PILOT!
RV-7/9 Drawings
ID: Pswd: RV-6A RV6A RV6 RV-6A RV7A RV7 RV-9A RV-9 RV9 RV-8A RV-8 RV8 RV-10 RV10 aviation aircraft Van's Aircraft RV8 RV8A RV-8 RV-8A RV-6 RV6 RV-6A RV6A RV-9 RV-9A RV9 RV9A RV10 RV-10 aopa eaa aviation experimental homebuilt airplane aircraft plane oshkosh
RV Construction Log
Preparation
Empennage
- Horizontal Stabilizer (49:40)
- Vertical Stabilizer (21:15)
- Rudder (32:15)
- Right Elevator (35:45)
- Left Elevator (30:50)
Wings
- Inventory & Setup (9:30)
- Left Wing Prep (54:30)
- Left Fuel Tank (45:20)
- Left Wing Skins (46:10)
- Right Wing Prep (34:15)
- Right Fuel Tank (47:50)
- Right Wing Skins (40:15)
- Ailerons (54:30)
- Flaps (40:30)
- Rods and ends (18:45)
Fuselage
- Fuselage Parts List
- Inventory and Setup (7:15)
- FireWall (14:30)
- F-704 Bulkhead (13:25)
- F-705 Bulkhead (14:20)
- Other Bulkheads
   and Longerons
(17:30)

- Tailcone (29:30)
- Center Section (35:15)
- Forward Section (52:40)
- Forward Assembly (24:30)
- Skins/Baggage Area (46:30)
- Seats & Seat Floors (30:15)
- Flaps & Gear Mounts (18:15)
- Fuselage Plumbing (14:0)
- Tail Feathers (16:35)
- Front Deck/Firewall (58:50)
Finish Kit
- Electrical (57:30)
- Electrical Part 2 (24:0)
- Canopy (22:30)
- Landing Gear (18:35)
How I Did Stuff
Pop-Rivet Dimpler 101
My Wing Jig
My Wing Cradle
Wing Cradle Mod
Tilting Tank Jig
Delrin Aileron Stops
Nutplate Preparation
Fiberglass 101
Events and News
Aviation Events
Aviation Events Around Texas
Fun Places To Fly in Texas
Aviation News
RV Groups & Support
Rivet Bangers
Van's Air Force
RV Information
How to Land an RV
Van's Aircraft
RV Resources
RV Photo Album
Completed RV-9's
RV-7/9A Drawings
Nut & Bolt Torque Values
Misc Goodies
Fuselage Parts List
How to Land an RV
My Tools
Fix a Heavy Wing
Paint Possibilities
Horizontal Stabilizer - 8/12/2005
Home  Previous Entry  Next Entry  Back
 
Share on:
Tail Kit has arrived!Tail Kit has arrived!
Wow! The shipping page on the Fedex website said that delivery would be on Monday evening at 7 pm, but here it is on the Friday before Monday at 11 am. There has a huge ding in the box that had me worried. The Fedex guy said that Van's probably did that when they put the straps on the box. I told him "I don't think so...".
Everything is in tact.Everything is in tact.
The vertical stabilizer skin was about 1/2 inch away from the ding in the box. Phew! Now to haul everything to the garage to do the inventory. I will also have to get the contract notarized and sent back to Van's. Luckily there is a lady who is a notary in my office.
Home  Previous Entry  Next Entry  Back
HELP FOR THE HOMEBUILDER

A website designed for Van's Aircraft Homebuilders, helping them find the information they need to build the most dynamic aircraft in the world.
The "cover your butt" section
This website was built to document the construction of an RV-9A in compliance with the FAA requirements needed to certify the aircraft. Any experiences and/or comments are by no means to be considered as instructions on how to build an RV-9A or any other aircraft.
This is website is owned and published by OpenAirNet, Inc. © 2015. All rights reserved.
Cool Stuff
How Far is that Airport?