RV Aircraft Construction Website

RV-12iS Construction Log:

1st Things First
- Getting Ready
- Pop-riveting
- Compressors
RV-12iS Tools & Techniques
- Drilling
- Dimpling and Countersinking
- Tools
- Riveting
RV-12iS: Vertical Stabilizer - 2/3/2020
Home  Previous Entry  Next Entry  Back
Share on:
Started work on the Vertical Stabilizer ribsStarted work on the Vertical Stabilizer ribs
Here are the plans. Doesn't look too complicated.
Pealing off the Blue StuffPealing off the Blue Stuff
Not fun, but must be done...
Trim off the front of the ribsTrim off the front of the ribs
This is most likely to prevent outward dents in the vertical stabilizer skin when attached. I also deburred and sanded all the edges on each rib.
Crimped the outer flangesCrimped the outer flanges
This crimp forces the rib to straighten so it lays flat on the work bench.
Pop-riveted the front spar and ribs togetherPop-riveted the front spar and ribs together
It's starting to look like something!
Smoothed the edges on the vertical stabilizer skinsSmoothed the edges on the vertical stabilizer skins
Sometimes on the scotch-brite wheel, but mostly with 320 grit sandpaper.
Riveted the nutplates to the forward sparRiveted the nutplates to the forward spar
These nutplates have screws that hold on the forward skin.
Clecoed everything togetherClecoed everything together
Time for pop-rivets!
Pop-riveted everything togetherPop-riveted everything together
So easy. Me likey!
Put on the Front SkinPut on the Front Skin
This is looking really good!
FinishedFinished
Now for the Rudder!
Home  Previous Entry  Next Entry  Back

SmittysRV.com is an Amazon Associate
HOMEBUILT, EXPERIMENTAL AND KITBUILT INSURANCE
gopro camera mounts for aircraft
gopro camera mounts for aircraft
Rod Machado Free Pilot Training Course Syllabus
RV Metal Aircraft Tools
Rod Machado Pilot Training
Rod Machado Pilot Training